Toggle menu
Toggle preferences menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

Tank: Difference between revisions

From Stationeers Wiki
Neouni (talk | contribs)
mNo edit summary
Update to use the new Structurebox syntax
Line 1: Line 1:
[[Category:Items]]
[[Category:Items]]
<languages />
<languages />
<translate>
<translate>
Line 20: Line 19:
=== Small Tank ===
=== Small Tank ===
{{Structurebox
{{Structurebox
  | name       = Small Tank
  | name             = Small Tank
  | image     = [[File:TankSmall.png]]
  | image           = [[File:TankSmall.png]]
  | placement = Large Grid
  | other            = 1 Kit to place volume 6000L
  | dectool    = Drill
| placed_with_item = [[Kit (Tank)]]
  | other      = 1 Kit to place<br>volume 6000L
  | placed_on_grid  = Small Grid
  | decon_with_tool1 = [[Hand Drill]]
  | item_rec1        = [[Kit (Tank)]]
}}
}}


<hr>
<hr>
=== large Tank ===
=== Large Tank ===
{{Structurebox
{{Structurebox
  | name       = Large Tank
  | name             = Large Tank
  | image     = [[File:TankBig.png]]
  | image           = [[File:TankBig.png]]
  | placement = Large Grid
  | other            = 5 Kits to place volume 50000L
  | dectool    = Drill
| placed_with_item = [[Kit (Tank)]]
  | other      = 5 Kits to place<br>volume 50000L
  | placed_on_grid  = Small Grid
  | decon_with_tool1 = [[Hand Drill]]
  | item_rec1        = [[Kit (Tank)]]
}}
}}


</translate>
</translate>

Revision as of 18:52, 6 July 2018

<languages /> <translate>

Kit (Tank) (Small Tank)
Max Pressure >30,000 kPa?
Recipe
Created With Hydraulic Pipe Bender, Fabricator
Cost 5g copper + 20g steel


Description

Tanks are used to store large amounts gasses. 50000L is currently the largest capacity container for gasses. Combined with its high bursting pressure (>300 atmospheres) it can store upwards of 72000 mols at room temperature (20 °C).

Given that pipes will burst at pressures greater than 60,795KPa, this is also a limit for the tanks, as all gases will be lost if the pipe connected to a tank ruptures.


Small Tank

Small Tank
1 Kit to place volume 6000L
Operation
Construction
Placed with Kit (Tank)
Placed on Small Grid
Stage 1
Deconstruction
Deconstructed with Hand Drill
Item received Kit (Tank)



Large Tank

Large Tank
File:TankBig.png
5 Kits to place volume 50000L
Operation
Construction
Placed with Kit (Tank)
Placed on Small Grid
Stage 1
Deconstruction
Deconstructed with Hand Drill
Item received Kit (Tank)


</translate>

Contents